# Spata-Artemida’s $7.7M Strategic Surge: A New Era for Local Infrastructure

> * The Region of Attica is executing a $7.7M strategic investment plan for the Spata-Artemida municipality.
> * Educational highlights include the construction of the 3rd Junior High of Artemida and the 5th Kindergarten of Spata.
> * The Mazareko Sports Center is undergoing a $1.6M renovation including a new arena and soccer facilities.
> * A massive 119-mile flood protection network is under development to secure the region against climate-related disasters.

![Spata-Artemida’s $7.7M Strategic Surge: A New Era for Local Infrastructure](https://myartemida.gr/post-images/7081115629174914613_o.jpg)

As part of an ongoing strategic initiative to strengthen ties with local governments, Attica Regional Governor **Nikos Hardalias** recently met with the Mayor of Spata-Artemida, **Dimitris Markou** . Official reports confirm that the summit focused on the progress of infrastructure projects with a combined budget of **$7.7 million (€7.3M)**, all integrated into a broader holistic development plan for the region.  

Beyond administrative briefings, the visit included on-site inspections of various active construction zones. These "boots-on-the-ground" assessments allowed leadership to evaluate progress and prioritize upcoming interventions in education, athletics, and civil protection.

Detailed Project Breakdown and Implementation
---------------------------------------------

The current strategic investments are categorized into three primary pillars of community development:

### **1. Educational Infrastructure**

* **Artemida's 3rd Junior High School:** This flagship project involves the construction of a contemporary school complex featuring two buildings on a 3.5-acre site. Budgeted at **$4.7 million (€4.46M)**, the facility is already under construction and will offer nine modern classrooms, specialized laboratories, and a comprehensive library.

* **Spata's 5th Kindergarten:** Backed by a **$1.5 million (€1.41M)** investment, this project focuses on an all-day kindergarten facility spanning over 11,000 square feet. The school is slated for completion by the next academic year and will feature modern classrooms, dining facilities, and dedicated resting areas.

### **2. Athletic Facilities**

* **Mazareko Municipal Athletic Center:** A **$1.6 million (€1.5M)** funding package has been allocated for the total reconstruction of the existing 1,100-seat indoor basketball arena. The project also includes a new soccer field and a complete overhaul of the surrounding grounds. Following the auction last September, the project is currently in the active tender phase.

### **3. Flood Protection and Drainage Networks**

A significant portion of the visit was dedicated to inspecting the **new rainwater drainage network** , a massive 119-mile (192 km) project being executed in collaboration with EYDAP. Budgeted at **$97 million (€92M)** and funded via the 2021-2027 Cohesion Fund, this initiative is specifically designed to **shield the municipality against extreme flooding events.**  
![Spata-Artemida’s $7.7M Strategic Surge: A New Era for Local Infrastructure](https://myartemida.gr/post-images/64d38e37-Zrzut-ekranu-2026-01-28-o-2-48-18-PM_o.jpg)

Leadership Perspectives
-----------------------

In his closing remarks, the Governor of Attica emphasized that flood protection is no longer a luxury but a core priority in the era of climate crisis. Similarly, Mayor Markou highlighted the seamless cooperation between the regional and local governments, ensuring that the community's urgent needs are met with efficiency.

The meeting was attended by key officials, including Deputy Governor for Eastern Attica Dimitris Damaskos, Special Consultant Elena Rapti, and the local Deputy Mayors of Spata-Artemida.

Related: https://myartemida.gr/arthro/anaptyxi-me-data-centers-ti-kerdizei-kai-ti-fovatai-i-anatoliki-attiki.md
------------------------------------------------------------------------------------------------------------------------------

Related: https://myartemida.gr/arthro/ti-chtizetai-apenanti-apo-to-smart-park-sta-spata-to-neo-data-center-tis-periochis.md
------------------------------------------------------------------------------------------------------------------------------------------